   Title Anaerobic Digester No.4 Fog Receiving Facility Bid Opening Date 06/08/2017 02:00pm    
Construction Bid Opportunities  
Title Anaerobic Digester No.4 Fog Receiving Facility
Bid Walk 05/27/2017 10:00am
  The site is very small, new work will replace an existing parking area. Please use Google Earth to see an overview of the site.
Bid Opening Date 06/08/2017 02:00pm
Estimated Cost $9.4 Million
Description The project shall consist of but is not limited to the following: Construction of a new anaerobic digester with appurtenances and auxiliary systems as shown and specified, construction of a fats, oils, and grease (FOG) receiving facility with appurtenances and auxiliary systems as shown and specified, and landscaping and civil improvements. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Unions***This is an SRF Funded Project*** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Survey *Dewatering *Shoring *Earthwork *Trucking *AB and AC Paving *Irrigation and Landscaping *Chain Link Fencing *Concrete Forming *Rebar *Concrete *Epoxy Injection *Structural and Misc Metals *FRP Fabrications, Handrail *Coated Foamed Roofing *Joint Sealants *Steel Dome Digester Annular Seal *Truncated Domes *Coatings *Signage *Pumps Horizontal, Chopper, Rotary Lobe *Rock Trap and Grinder *Digester Draft Tubes, Accessories *Carbon Odor Canister *Heat Exchanger Tube, Spiral *Portable Chemical Mixing Tank System *Welded Steel Storage Tank *Fixed Steel Digester Dome *Pipe Supports *Valves *Piping *Heat Trace *Electrical *Instrumentation Plans and specifications can be purchased from Studio Blue (925) 463-9660; downloaded or viewed at our website www.gseconstruction.com , if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file DSRSD Plans.pdf
  Specs :
pdf file DSRSD Specs 2 of 2.pdf
pdf file DSRSD Specs 1 of 2.pdf
  Add.s & Upd. :
pdf file DSRSD Addendum 01.pdf