GSE Construction

Welcome to GSE Construction

   Title Sewer Lift Station at Monitor & White Lane Bid Opening Date 06/01/2017 11:00 am    
Construction Bid Opportunities  
Title Sewer Lift Station at Monitor & White Lane
Bid Walk 05/03/2017 10:00 am
  Site can be viewed 24/7/365 or can seen at Google Earth. Project sites are very small.
Bid Opening Date 06/01/2017 11:00 am
Estimated Cost $1.2 Million
Description The project shall consist of but is not limited to the following: The replacement of the existing sewage lift station with a new one. Work includes demolition of existing lift station; abandonment of existing truck sewer line; reconstruction of manholes; construction of new sewer force main; construction of new lift station; lift station site improvements. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Union**** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Survey *By Pass Pumping *Trucking *Demolition *Shoring *Traffic Control *AC Patch Paving *Chainlink Gate * Precast MH and Wetwell *Site Concrete *Rebar *Concrete *Masonry *Misc Metals * Access Hatches *Painting and Coating *WEMCO Hydrostal Pumps and Prerotation Bases *Air Scrubber *Canopy *Tuff Shed *Natural Gas Generator*Piping and Valves *Electrical *Instrumentation Plans and specifications can ordered from The City of Bakersfield 661.852.2100 or downloaded from our website www.gseconstruction.com if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file SLS at Monitor St and White Ln Plans.pdf
  Specs :
pdf file SLS at Monitor St and White Ln Specs.pdf
  Add.s & Upd. :
pdf file SLS Addendum 02.pdf
pdf file SLS Addendum 01.pdf