GSE Construction

Welcome to GSE Construction

   Title CLWA Foothill Feeder Turnout Bid Opening Date 01/31/2017 02:00 pm    
Construction Bid Opportunities  
Title CLWA Foothill Feeder Turnout
Bid Walk 01/10/2017 10:00 am
  Project site is near Parkwood Lane Bridgeport Lane in Santa Clarita. Site can be accessed 24/7/365.
Bid Opening Date 01/31/2017 02:00 pm
Estimated Cost $3.9 Million
Description The project shall consist of but is not limited to the following: Construction of a new 140 cfs turnout structure known as CLWW-01. The turnout consists of constructing a new concrete valve vault and a new meter vault, equipped with an owner furnished Plug Valve, the meter vault will require a 36 magnetic type flow meter. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Union**** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Survey *Hazardous Removals *Trucking *Shoring *AC Patch Paving *Pipeline Disinfection *Rebar *Concrete *Precast Manhole *Misc Metals *Handrails *Grating *Hatches *Painting *Submersible Sump Pumps *Piping *Fabricated Piping *Exhaust Fan * Cathodic Protection *Electrical *Instrumentation Plans and specifications are available at www.clwa.org/doing-business . ; they can download or be viewed on our website www.gseconstruction.com if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file FFT Title and G Drwgs.pdf
pdf file FFT C Drwgs.pdf
pdf file FFT S Drwgs.pdf
pdf file FFT T Drwgs.pdf
pdf file FFT M Drwgs.pdf
pdf file FFT E Drwgs.pdf
pdf file FFT I Drwgs.pdf
pdf file FFT Reference Drwgs.pdf
  Specs :
pdf file FFT Specs.pdf
  Add.s & Upd. :
pdf file FFT Addendum No 02.pdf
pdf file FFT Addendum No 01.pdf