   Title Recycled Water System Phase IV Booster Pump Station Bid Opening Date 11/8/2016 02:00 pm    
Construction Bid Opportunities  
Title Recycled Water System Phase IV Booster Pump Station
Bid Walk 10/24/2016 10:00 am
  Thisis located at the xn existing Reservoir/Tank site. Site working is small, see Google Earth fo overhead view.
Bid Opening Date 11/8/2016 02:00 pm
Estimated Cost $1,564,860
Description The project shall consist of but is not limited to the following: Constructing a New Booster Pump Station. Work includes a masonry building to house four pumps, VFDs, electrical power distribution and control panels, piping, valves and a install a 5,000 Hydropneumatic tank on site. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Union**** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Survey *Trucking *AC Sawcutting *AB & AC Patch Paving *Piping Disinfection *Rebar *Concrete *Masonry *Misc Metals *Rough Carpentry *Asphalt Shingle Roof *HM Doors, Frames and Hardware *R/U Doors *Coatings *Building Insulation *Skylights *Louvers *Pumps- Booster *Hydropneumatic Tank *Pipe Supports *Piping- DIP, Fab Steel, PVC *Valves *HVAC *Electrical *Instrumentation Plans and specifications can be viewed at http://countyofventura.org and on our website www.gseconstruction.com if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file WW16-02 Drwgs.pdf
  Specs :
pdf file WW16-02 SpecBook.pdf
  Add.s & Upd. :
pdf file WW16-02 AddendumNo.1.pdf
pdf file WW16-02 AddendumNo.2.pdf