   Title Consolidated Treatment Facility Phase II Expansion, CIP #WW14-14 Bid Opening Date 10/25/2016 02:00 pm    
Construction Bid Opportunities  
Title Consolidated Treatment Facility Phase II Expansion, CIP #WW14-14
Bid Walk 10/04/20106 10:00 am
  Pending, All subcontractors interested in this project should attend the 10/04/16 job walk at 10:00 am at the Lathrop site.
Bid Opening Date 10/25/2016 02:00 pm
Estimated Cost $10,000,000
Description The scope of work to be performed under this contract is generally described as, but not necessarily be limited to: furnishing labor, materials, services and equipment required as necessary for the Consolidated Treatment Facility Phase II Expansion Project, CIP WW 14-14. In accordance with the plans and specifications and other bid documents, the work generally consists of the construction of an expansion to the existing facility and the conversion of the existing plant to an aerobic digester. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Union**** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Survey *Demolition *Precast Concrete Vaults/Manholes *Dewatering *AB and AC Paving *Geomembrane *Iron Fence and Gates *Dbl Wall Stormdrain Pipe *Concrete Falsework *Rebar *Concrete *Masonry *Structural and Misc Metals *Metal Decking *Alum Handrail and Grating *Rough and Finish Carpentry *Bldg Insulation *Roof Accessories *Metal Wall and Soffit Panels *Exterior Fiber Cement Siding *Mod Bit Membrane Roofing *Flashing and Sheetmetal *Caulking and Sealants *HM Doors, Frames and Hardware *Coiling Doors *Aluminum Storefronts, Windows and Glazing *Lath and Plaster *Drywall Systems *Ceramic Tile *Acoustical Ceiling Systems *Painting and Coating *Louvers *Fire Protection Specialties *Signage *Lockers *Toilet Compartments and Accessories *Assistive Listening Devices *Pumps Submersible, Multi Stage Centrifugal *Chemical Feed Systems *Aeration System *Submersible Mixers *Headworks Screening Systems *Odor Control System *Lab Equipment *Wood Plastic Laminate Casework *Inset Steel Lab Casework *FRP Baffle Walls *HDPE Tanks *Spill Pallet *Hoists and Cranes *Pipe Supports *Piping Fabricated Steel and SST, DIP, PVC *Valves *FRP Ducting *Slide and Weir Gates *Plumbing *HVAC *Electrical *Standby Generators *Instrumentation Plans and specifications can be ordered from ARC Stockton at (209) 464-8724 ; or they can be viewed and downloaded from our website www.gseconstruction.com if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file CTF G Drwgs.pdf
pdf file CTF C Drwgs.pdf
pdf file CTF M Drwgs.pdf
pdf file CTF S Drwgs.pdf
pdf file CTF A Drwgs.pdf
pdf file CTF ME Drwgs.pdf
pdf file CTF T Drwgs.pdf
pdf file CTF P Drwgs.pdf
pdf file CTF E Drwgs 1 of 3.pdf
pdf file CTF E Drwgs 2 of 3.pdf
pdf file CTF E Drwgs 3 of 3.pdf
pdf file CTF I Drwgs.pdf
  Specs :
pdf file CTF Specs.pdf
pdf file CTF Appendix A - Geo Report.pdf
pdf file CTF Appendix B 1 of 3- Koch Membrane.pdf
pdf file CTF Appendix B 2 of 3- Koch Membrane.pdf
pdf file CTF Appendix B 3 of 3- Koch Membrane.pdf
pdf file CTF Appendix C - Neuros Blowers.pdf
  Add.s & Upd. :
pdf file CTF Addendum 03.pdf
pdf file CTF Addendum 02.pdf
pdf file CTF Addendum 01.pdf
pdf file CTF Addendum 01 Part A.pdf
pdf file CTF Addendum 01 Part B.pdf