   Title South Reservoir Replacement Spec 2075 Bid Opening Date 11/02/2016 01:30 pm    
Construction Bid Opportunities  
Title South Reservoir Replacement Spec 2075
Bid Walk 09/21/2016 10:00 am
  Current site is consumed by the existing reservoir. Due to the site layout and planned construction, there still isn't alot of excess laydown space.
Bid Opening Date 11/02/2016 01:30 pm
Estimated Cost $12,000,000
Description The project shall consist of but is not limited to the following: F & I a 9 MG, partially buried, prestressed concrete tank, valve vault, and associated piping and appurtenances. F & I direct buried steel piping and HDPE in a steel casing via trenchless installation. F & I site grading and paving; drainage improvements; electrical, instrumentation, control and telemetry systems; water quality control cabinet; landscaping and irrigation system; fencing; and perform related work at the South Reservoir site as per the Contract Documents. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Union**** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Selective Demolition *Earthwork *Temp Retaining Wall/Sheet Pile *Trucking *Dewatering *Geo Mats *Geotextile Slope Protection *AB and AC Paving *Pavement Marking *Chainlink Fence and Gates *Planting and Irrigation * Hydraulic Seeding *Pipe Jacking *Rebar *Concrete *Precast Concrete *Structural and Misc Metals *Waterproofing Bituminous, Cold Fluid Applied *Built-Up Roofing *Flashing and Sheetmetal *Joint Sealants *Hatches Access, Vault, Roof *Painting and Coating *Pipe ID *Regenerative Turbine Pump *Piping CML Steel, HDPE, Corrugated Poly Pipe *Valves *HVAC Fans *Electrical *Instrumentation Plans and specifications can be viewed at www.ebmud.com/current-construction-bids ; viewed at our Livermore Office, or they can be viewed on our website www.gseconstruction.com if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file Spec 2075 General Drwgs.pdf
pdf file Spec 2075 Demolition Drwgs.pdf
pdf file Spec 2075 Civil Drwgs.pdf
pdf file Spec 2075 Structural Drwgs.pdf
pdf file Spec 2075 Mechanical Drwgs.pdf
pdf file Spec 2075 Process Drwgs.pdf
pdf file Spec 2075 Electrical Drwgs.pdf
pdf file Spec 2075 Landscaping Drwgs.pdf
pdf file Spec 2075 Pipeline Drwgs.pdf
pdf file Spec 2075 S Reservoir Seismic Valve Drwgs.pdf
pdf file Spec 2075 Reference Drwgs.pdf
pdf file Spec 2075 EBMUD Standard Drwgs.pdf
  Specs :
pdf file Spec 2075 v1 Specs.pdf
pdf file Spec 2075 v2 Specs.pdf
pdf file Spec 2075 v3 Specs.pdf
pdf file Spec 2075 Geotech Report 2012.pdf
pdf file Spec 2075 Geotech Report 2013.pdf
  Add.s & Upd. :
pdf file Spec 2075 Addendum 2.pdf
pdf file Spec 2075 Addendum 1.pdf