   Title Newhall Lateral Facility Reach 2B Mods Bid Opening Date 07/12/2016 02:00 pm    
Construction Bid Opportunities  
Title Newhall Lateral Facility Reach 2B Mods
Bid Walk 06/21/2016 10:00am
  Project is along the South Fork Trail. Sites can be visited anytime as this is a public trail.
Bid Opening Date 07/12/2016 02:00 pm
Estimated Cost $450,000
Description The project shall consist of but is not limited to the following: temporary trail modifications and detours; excavation; water discharge; fabrication and installation of steel pipeline assemblies; disinfection; removal and installation new butterfly valves; pipeline re-activation, and all related work as indicated in the contract documents. Please Note ***Pursuant to SB 854 please include your Proof of Registration for doing Public Works Projects in CA. with your quote ***All Equipment used on this Project must meet the current C.A.R.B Regulations*** Please note that GSE Construction is signatory to the Laborers Union**** GSE Construction Co., Inc. is an Equal Opportunity Employer. Potential Subcontractors shall make themselves familiar with GSEs Subcontract, by visiting our website, www.gseconstruction.com , and reviewing our subcontract document. GSE Construction requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. GSE will reimburse Subcontractors for the required bond premium, so please provide your bond rate at time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction, unless the specific project contract documents have other requirements. Please contact us for any insurance, bonding or other project related questions. For subcontracts greater than $100,000 in amount, performance and payment bonds in an amount equal to 100% of the subcontract price shall be required, issued by sureties satisfactory to Contractor, with the reasonable premium charge for the bonds (which shall not exceed 1.75% of the amount of the subcontract) to be reimbursed by Contractor. In Contractors sole subjective discretion, Contractor may determine to waive or reduce this requirement. Please list any bond premiums as a separate line item. Subcontractor also shall be required to execute a subcontract that is in substantially the form of Contractors standard subcontract document, which is available for review at Contractors offices. We are looking for quotes for the following subcontractors/suppliers: *SWPPP *Survey *Temp Fencing *Temp Shoring *Aggregates *Trucking *Rebar *Concrete *Precast Vaults *Painting and Coating *Pipeline Disinfection *Fabricated Steel Pipe *Valves Plans and specifications can be downloaded from www.clwa.org ; viewed at our Livermore Office, or they can be viewed and downloaded from our website www.gseconstruction.com if you have any problems please contact Paul @ 925.447.0292.
Construction Documents Plans :
pdf file CLWA Lat B Drwgs.pdf
  Specs :
pdf file CLWA Lat B Specs.pdf
  Add.s & Upd. :
pdf file Newhall Lateral Facility Reach 2B Addendum 01.pdf